Who handles the solar panels during a reroof?
A roofer's C-39 license covers roofing, not the electrical system. Disconnecting, removing and reconnecting a photovoltaic system is work for a C-46 solar contractor or a C-10 electrical contractor. Some roofers coordinate it through a subcontractor; others leave it to your original installer.
What drives the solar removal and reinstall price?
- Number of modules
- Mounting: standard rails, tile mounts, flat-roof racks
- Condition of hardware found during removal
- Height and access
- Reinstall permit or inspection where required
What if the system is leased?
Leased and PPA systems belong to the provider, so the agreement decides who may remove them and how much notice is needed. For owned systems, check whether the installer's warranty requires them, or a certified contractor, to do the removal.
Should I replace the roof while the panels are off?
If your roof is near the end of its life and you plan to keep the solar, replacing the roof before the panels go back on avoids paying for removal twice. Ask the roofer to check the deck under the array, which is often the most neglected part of the roof.
What's different in the South Bay?
Santa Clara County has a lot of rooftop solar on single-story tract roofs, Eichlers and tile roofs, and each type is different to work around. Tile roofs use special mounts, and tiles around them break easily, so plan for replacement tile. Eichler flat roofs need every attachment flashed into the membrane or foam. Because every city we checked is in climate zone 4, the new roofing under the array is generally a rated cool-roof product on a qualifying reroof.
How do I get a price?
Ask for one written estimate that covers removal, storage, reroofing, new flashed mounts and reinstall, or two coordinated estimates with clear responsibilities. For your actual price, request a free written estimate: a licensed roofer measures the roof and prices your exact scope.
Related: what drives roof replacement cost, roof size estimator, metal roofs and solar, quote checker.
Every roofer we work with is licensed, insured and highly reviewed by Bay Area homeowners.
Get a free replacement quoteFrequently asked questions
Does removing solar void my warranty?
It can affect the installer's workmanship warranty if someone else removes it. Ask the installer first.
Is solar removal included in a roof quote?
Often not. Ask whether it's included, priced separately or excluded, and get it in writing.
Is solar removal harder on a tile roof?
Usually. Tile mounts are different, and tiles crack easily when panels come off and go back on. Budget for some replacement tile.
Sources
- CSLB: C-46 solar contractor classification
- CSLB: C-10 electrical contractor classification
- CSLB: check a license
- CEC: climate zones
- City of San José: permits
Sources reviewed November 12, 2026. Figures are published estimates and official fees, not quotes. Confirm prices, permits and requirements with your contractor and building department. This page is general information, not legal or insurance advice.